You are here: Home Remediation Superfund Jones Road

Jones Road Groundwater Plume

Specific information on Jones Road Groundwater Plume in Houston, Harris County.

Last Date Updated: September 1, 2010


Site Description:

The Jones Road site is a groundwater plume contaminated with tetrachloroethylene (PCE) from the former Bell Dry Cleaners at 11600 Jones Road and other potential sources. PCE is a manufactured chemical that is widely used for dry cleaning of fabrics. In January 2003, the plume was documented to extend from the southern end of Echo Spring Lane to Tower Oaks Boulevard and from Timber Hollow to the eastern side of Jones Road. (Read the full site description).

EPA ID: TXN000605460
Location Northwest Harris County  Map
Latitude 29º56'29"N
Longitude -95º35'08"W
Hazard Ranking Score (HRS) 46.50
Contaminants at Time of HRS Cis-1,2-dichloroethene, Tetrachloroethylene, Trichloroethylene
EPA Region Texas - 6
TCEQ Region Houston - 12
Legislative District Texas Senate -  7
Texas House - 126 and 130
U.S. Congress - 7

Recent Site Actions:

  • August 2010, Feasibility Study Report errata for Figure 3 and Figure 16.  The northeast boundary for the Area of Institutional Controls (shown in green) has been moved slightly to the west of the Waterline Service boundary (shown in black).
  • May 2010, EPA Announces Proposed Plan.  The Proposed Plan Public Meeting is scheduled on June 3, 2010.
  • March 2010, following the completion of the Feasibility Study, the lead agency responsibilities have transfered from the TCEQ to the EPA. Information from the EPA about the Jones Road Groundwater Plume federal Superfund site can be found on the EPA web site.
  • Exit TCEQ
  • February 2010, Feasibility Study has been completed. The report is broken up into four parts (Part 1, Part 2, Part 3 and Part 4).
  • February 2009, the first post-water line groundwater monitoring event was conducted.  Samples were collected from 10 deep monitor wells and two water wells.
  • (Chronology of Actions)
Remedial Investigation Documentation: Quarterly Sampling Results:
Notice:
TCEQ is not endorsing any company that is selling products associated with the testing of water wells, installation of water filters, or any other products that might be associated with this site.

Water Wells and Sampling Information Community Meeting Transcripts: TCEQ Project Staff Contacts
Project Manager: Marilyn Czimer Long, P.G.
P.O. Box 13087 - MC-136
Austin, Texas 78711-3087
Phone: 1-800-633-9363, Ext 0761
E-mail: superfnd@tceq.state.tx.us
Project Engineer: Subhash C. Pal, P.E.
P.O. Box 13087 - MC-136
Austin, Texas 78711-3087
Phone: 1-800-633-9363, Ext 4513
E-mail: superfnd@tceq.state.tx.us
Community Relations Liaison: John Flores
(Bilingual: English-Spanish)
P.O. Box 13087 - MC-142
Austin, Texas 78711-3087
Phone: 1-800-633-9363, Ext 5674
E-mail: superfnd@tceq.state.tx.us
Funded by: Hazardous & Solid Waste
Remediation Fee Account
Records Repositories:

Northwest Branch Harris County Library
11355 Regency Green Drive
Cypress TX 77429
Phone: 281-890-2665

TCEQ Central File Room
12100 Park 35 Circle
Building E, First Floor, Room 103
Austin TX 78753
512-239-2900
512-239-1850 (fax)
cfrreq@tceq.state.tx.us


Photo Gallery Other Things You Might Want to Know

Back to Top

Document Actions